Kaminho, an FPSO project in Angola!
The fields are expected to pump out 80 000 barrel per day
Key Figures
- Cameia and Golfinho fields (block 20) are renamed Kaminho
- Final investment is $6 billion in Kaminho
- TotalEnergies owns a 40% stake, Petronas 40% and Sonangol 20%
- The main contractor, Saipem, selected Chinese yards to build the FPSO
Abyssien contribution
- Expertise in maritime engineering & shipbuilding
- Achieve the hull hydrodynamics analyses
- Provide naval expertise in mooring system design
- Contribute at the installation requirement for the FPSO
- Welding Engineering
- Monitors and coordinates welding activities related to QMOS
- Perform the DMOS procedure
- Coordinates welding tests activities in China